| E05 | Flue pressure switch anomaly. | The air pressure switch does not switch (damaged diaphragm/contacts, blocked hoses or venturi inlets); check micro continuity at start-up and the depression in the venturi with a manometer (in Pigma 24 FF ≥70 Pa). |
| 6 07 | Pressure switch ON Fan OFF (flue pressure switch closed with fan stopped). | The pressure switch remains stuck/closed due to internal fault or moisture in the tubes; check that it remains closed without depression (continuity test) and ensure that the hoses do not have siphon/condensate. |
| 6 08 | Pressure switch OFF Fan ON (flue pressure switch open with fan running). | The pressure switch does not close when draft is generated (fatigued diaphragm or blocked connections/hoses); check that it closes with the fan running by measuring continuity and pressure drop in the venturi. |
| 6 P1 | Flue Pressure Delay (late closure of the flue pressure switch). | The pressure switch takes time to switch to ON due to slow response or lack of initial depression; measure the micro-switching times when the fan starts and clean the pressure switch connections/hoses. |
| 6 P2 | Flue Pressure Opening (unexpected opening of the flue pressure switch). | The pressure switch opens during service due to membrane instability or momentary loss of depression; monitor micro continuity with the fan at speed and check tubes and connection to the venturi. |