PCB (control board): refurbished spare part that controls the ignition, modulation, and safety features of the boiler. Useful if the boiler does not ignite, locks up, or the display does not respond. Compatible with VMW ES 24 282/3-5, VMW ES 282/3-5, VMW 24/282/3-5 (ref. 130859). Includes a one-year warranty and delivery within 2–4 working days in the EU.

1
Consult via WhatsApp
Delivery in 2–4 working days
1-year warranty
14-day return
Technical support

Key Data

Reference
130859
Brand
Vaillant
Type of part
PCBs (control boards)
Available units
2 units in stock
Status
Refurbished
Warranty
1 year
Shipping
2–4 working days (EU)
Return
14 days

The same part (ref. 130859) equips these models. Verified compatibility; check the reference before purchasing.

Turbomax Plus

  • VMW ES 24 282/3-5
  • VMW ES 282/3-5
  • VMW 24/282/3-5
  • VMW 282/3-5

Fault codes related to this part (not the entire boiler). They usually have more possible causes: first rule out electrodes, wiring/connections, and gas supply. Verified with ≥3 sources.

CodeWhat does it mean?Cause and diagnosis (this part)
F.63Fault: EEPROM (electronics fault).Corruption/invalid reading of the EEPROM memory on the PCB; check voltages and connectors on the board and, if it persists after reset, replace the PCB.
F.64Fault in the electronics / NTC (NTC short circuit or defective electronics).NTC input or analogue stage of the PCB short-circuited/damaged; check NTC and wiring, and if the sensors are correct, diagnose/replace the PCB.
F.65Electronic system temperature too high.Overtemperature detected on the PCB due to external influence or internal defect; check ventilation/location and, if it reappears when cold, replace the PCB.
F.67Electronic fault/flame: implausible flame signal (defective electronics).The flame detection circuit on the PCB delivers an invalid signal; rule out electrode/ground and, if the ionisation is correct, the PCB is faulty.
F.70Invalid appliance code (DSN).Display and/or PCB were replaced simultaneously without reprogramming the DSN/coding; verify and adjust DSN or coding resistor on the PCB.
F.97Main PCB self-test failed.The PCB does not pass its internal self-test due to component/firmware default; repeat start-up and, if it persists, replace the control board.
withNo communication between the display and the PCB (communication fault).The line and interface of the PCB do not communicate with the panel; check the bus/wiring and connectors, and if they are correct, the PCB (or the display) is faulty.
F.61Gas valve activation/operation error.Fault in the valve driver/control on the PCB or PCB-valve communication; check the harness and valve coils, and if they are correct, the PCB is damaged.
F.62Gas valve switch-off delay.The closing signal from the PCB arrives late/incorrectly or the board's driver fails; if the valve is sealed, the origin is the PCB (signal/power stage).
F.26Current of the stepper motor gas valve not plausible.Reading/control stage fault in the PCB towards the stepper motor of the valve; if connections and valve are OK, the fault is in the PCB.
How do I know if this PCB is for my boiler?
Verify the reference 130859 printed and ensure your model is on the list of compatible ones; also compare the connections with the original part.
What is it used for?
The PCB controls the ignition, modulation, sensor readings, and safety features of the boiler.
Is the boiler not igniting, locking out, or is the control board unresponsive?
After ruling out mains voltage, fuse, and connectors, a damaged PCB causes lockouts, blackouts, or erratic display. Repair the external cause before installing the new one.
Which models is it suitable for?
Part shared by various models (see Compatibility). If your model does not appear, send us a photo of the marking and we will confirm it.
Installation and recommendations
After installation, a technician must adjust the service parameters (type of gas, power settings) and check combustion and safety features.
What does refurbished mean and what coverage does it have?
Part removed from a boiler out of service, inspected and tested. Includes 1-year warranty and 14-day return policy. Delivery within 2–4 working days in the EU.

Related Spare Parts Boiler VMW ES 24 282 3 5

Scroll to the top